您的位置:
首页 >> 资讯资料 >> 资格认证 >> 正文:PMP样题第四期

PMP样题第四期

1.
 In which process group do we transfer resources to other systems?
a. Initiating
b. Executing
c. Controlling
d. Planning
e. Closing
 
2.
 The change control system must include all but which of the following?
a. The paperwork
b. The tracking system
c. Verbal approvals
d. Authorization approval levels
 
3.
 In order to ensure that the receiver has understood the message the sender must:
a. hand deliver the message
b. receive a signature of acceptance
c. receive feedback
d. b and c
 
4.
 Decomposition occurs during:
a. scope planning
b. scope verification
c. scope definition
d. project initiation
 
5.
 Which of the following CANNOT be tracked using the WBS?
a. Time
b. Cost
c. Quality
d. Amount of work
【作者:本站编辑┊来源:不详┊2003-02-17】TAGS:
评论与咨询 内容报错
姓名: 电话: 邮箱: 地址:

  • ·本咨询平台是部分培训机构与本站指定的网上报名、咨询的专用平台,您可以通过此处提交您的信息,我们或该机构会根据您所提交的信息及时给予回复;
  • ·为了更好的问您服务,请填写您真实的姓名和相关联系方式,以便我们能及时给您答复;
  • ·不得提交有关违反国家互联网规定的不良信息,对于违规者我们有权追究你的法律责任!若有任何问题请 联系我们
关于我们 | 服务条款 | 广告服务 | 客服中心 | 网站导航 - 设为首页 - 收藏本站
Copyright © 2006-2008 www.0512edu.com.cn All Rights Reserved
苏州培训资讯网 版权所有
Powered By:AspArticle2.0 在远方